Measuring And Improving The Effectiveness Of ISO 31000 Based Erm In State-Controlled PSO - A Case Study Of Toll Road Operators In Indonesia

Authors

  • Antonius ALIJOYO Parahyangan Catholic University, Indonesia
  • Charles R. VORST Center for Risk Management and Sustainability, Indonesia

DOI:

https://doi.org/10.38142/ijesss.v3i1.159

Keywords:

maturity assessment, risk management, ISO31000, SOE, toll road operator

Abstract

Toll road operators need to implement effective risk management. This study focuses on how a State-Owned Enterprise (SOE) toll road operator assesses the maturity of their ISO 31000-based risk management practices by using an ISO 31000-based risk management maturity model, ERMA ISO31000 RM3. The study is predominantly based on a qualitative approach through document reviews, questionnaires, and interviews. The assessment result shows that the company's risk management maturity score reaches 3.62 (a scale of 0.00 – 5.00) or at the DEFINED level of the risk management maturity. The study also shows that the company's risk management process gets the highest score, 4.45, while the lowest score, 3.22, is for the company's performance management. By using the maturity assessment result, the company's management can develop a risk management improvement road map to assist their efforts in increasing the effectiveness of their existing risk management practices. Referring to the assessment result, the management can prioritize the improvement on low-score maturity attributes, such as their performance management, risk culture, resilience and sustainability, risk management framework, and management process, while maintaining their current practices of the risk management process, which has already reached a considerably high maturity level.

Downloads

Download data is not yet available.

References

Alijoyo, H. S. (2021). Enterprise Risk Management: The Maturity Model. #rd International Conference on Applied Research in Business, Management & Economics (p. 18). DPublication.com.

Alijoyo, H. S. (2021). The State-of-The-Art of Enterprise Risk Management Maturity Models: A Review. The Annals of the Romanian Society for Cell Biology Vol. 25 Issue 2, 25.

Alijoyo, N. (2021). Risk Management Maturity Assessment Based on ISO 31000 - A Pathway Toward the Organization's Resilience and Sustainability Post COVID-19: The Case Study of SOE Company in Indonesia. 3rd International Conference on Management, Economics & Finance, (p. 125).

Bisnis.com. (2021, 03 24). BPJT: Pembangunan Jalan Tol Tahun Ini Bakal Ngebut. Retrieved from

Bisnis: https://ekonomi.bisnis.com/read/20210324/45/1371972/bpjt-pembangunan-jalan-tol-tahun-ini-bakal-ngebut

Bryce, R. A. (2020). Resilience in the Face of Uncertainty: Early Lessons from the COVID-19 Pandemic. Journal of Risk Research Vol. 23 Nos 7-8, 881.

CNBCIndonesia.com. (2020, 12 3). Get Ready! Every SOE Will Have Risk Management Director in

Retrieved from CNBC Indonesia:

https://www.cnbcindonesia.com/market/20201203122938-17-206557/siap-siap-setiap-bumn-ada-direktur-risk-management-di-2021

Emovis-tag.co.uk. (2020, 02 17). 5 Benefits of Toll Roads. Retrieved from Emovis-tag:https://www.emovis-tag.co.uk/articles/5-benefits-of-toll-roads

ERM Academy. (2021). ERMA ISO31000 RM3 Risk Management Maturity Model - Methodology and

Application of ISO 31000-Based Risk Management Maturity Assessment. ERM Academy.

KataData.co.id. (2021, 4 29). Erick Thohir Assesses This Year Will Only Be A Momentum for SOE To

Survive. Retrieved from Kata Data: https://katadata.co.id/yuliawati/finansial/608a8c449dd1d/erick-thohir-menilai-tahun-ini-cuma-momen-bumn-bertahan-hidup

Kawulur, N. M. (2020). Congestion Impact Analysis on the Economy of the Road User: In the Front of the Manado City Park Monument. Periodic Scientific Journal Efficiency Vol. 20 No. 10, 86.

Liputan6.com. (2021, 04 27). The Length of Operating Toll Roads in Indonesia Have Reached 2.391KM.

Retrieved from Liputan 6: https://www.liputan6.com/bisnis/read/4543324/panjang-ruas-tol-di-indonesia-yang-sudah-beroperasi-capai-2391-km#:~:text=Staf%20Ahli%20Menteri%20PUPR%20Bidang,Usaha%20Jalan%20Tol%20(BUJT)

MediaBUMN.com. (2020, 10 19). Risk Management Should be the Focus of SOE. Retrieved from Media BUMN: https://mediabumn.com/manajemen-risiko-harus-jadi-perhatian/

MediaBUMN.com. (2020, 12 1). SOE Performance 2021 is Predicted Will Still Be Decreasing 30 Percent. Retrieved from Media BUMN: https://mediabumn.com/kinerja-bumn-tahun-2021-diprediksi/

Noor, H. S. (2017). Social Economy Impact Analysis on The Development of Toll Road Surabaya-Mojokerto. National Seminar & Scientific Gathering Reseracher Network (p. 270). Banyuwangi: IAI Darussalam.

Okezone.com. (2021, 1 22). Erick Thohir Monitor Risk Management of SOE Abroad. Retrieved from

Okezone: https://economy.okezone.com/read/2021/01/22/320/2348962/erick-thohir-pelototi-manajemen-risiko-bumn-yang-di-luar-negeri?page=1

Proenca, V. B. (2017). Risk Management: A Maturity Model Based on ISO 31000. IEFE 19th Conference on Business Informatics, (p. 99).

Satriaputri, C. (2015). Operational Risk Analysis on PT Jasa Marga (Persero) Tbk. Jagorawi Toll Road. Journal Management and Organization Vol. VI No. 3, 259.

Susanti, M. (2015). Estimation of Congestion Cost in Medan. Puslitbang Manajemen Transportasi Multimoda.

Vadali, S. R. (2008). Toll Roads and Economic Development: Exploring Effects on Property Values. The Annals of Regional Science, 20.

Vorst, P. B. (2018). Risk management Based on SNI ISO 31000. National Standardization Agency.

Downloads

Published

2022-03-31